ACME Solar Holdings informs about updates
ACME Solar Holdings has informed that ACME Solar Holdings (‘ASHL’), through its wholly owned subsidiary, ACME Sun Power, has commissioned the first phase of 33.335 MW/160.48 MWh out of 300 MW/1400 MWh capacity of Battery Energy Storage System (BESS) Project located at Village: Badi Sid, Tehsil-Bap, Dist: Phalodi and Jodhpur, Rajasthan. The Commercial operation date (COD) for the above-mentioned phase-I shall be March 08, 2026.
The above information is a part of company’s filings submitted to BSE.

