NTPC’s arm starts commercial operations at Unit IV (250 MW) of Tehri PSP
The total installed capacity of NTPC group stands at 89,378 MW and commercial capacity at 88,298 MW
NTPC’s subsidiary -- THDC India has started commercial operations at its Unit IV (250 MW) of Tehri PSP (4X250 MW) from April 12, 2026. With this, the total installed and commercial capacity of THDC India stand at 3,907 MW.
With addition of these capacities, the total installed capacity of NTPC group stands at 89,378 MW and commercial capacity at 88,298 MW.
NTPC is the largest power utility company in India and has presence in Coal, Gas, Solar PV, Hydro and Wind Power Generation and Coal Mining.

